Panel unloading and loading hig slicing filling mining method
A backfill mining method and backfill mining technology, applied in the fields of backfill, surface mining, mining equipment, etc., can solve the problem of inability to implement large-scale stope structures and large-scale mechanized mining operations, restrictions on stope production capacity and mining efficiency, and mining costs. problems such as increase, to achieve the effect of realizing large-scale mechanized mining operations, expanding the size of the stope structure, and reducing secondary stress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0009] This is a high layer and fill mining method using only panel end unloading, which divides the ore body into mining panels along the strike direction of the ore body. It can be seen from Fig. 1 that in a mining panel, a vertical ore body trend vertical stope (A, B) is arranged at both ends, and multiple vertical ore body trends are arranged between the vertical stopes A and B Panel stopes (1-7). Vertical slot stopes (A, B) and panel stopes (1-7) are mined by upward layered filling mining method, and tailing sand cemented filling is carried out after mining. However, the vertical slot stope (A, B) must be recovered and filled ahead of the panel stope (1-7). The stope is mined and filled, and the layer height of the vertical groove stope is preferably lower than that of the panel stope, and the width of the vertical groove stope is narrower than the width of the panel stope. In this embodiment, the layer height of the stope of the vertical slot is 2-3m, and the width is ...
Embodiment approach 2
[0011] This is a high-layer filling mining method with unloading at the bottom and end of the panel. The ore body is divided into mining panels along the strike direction. Vertical channel stopes (A, B) vertical to the ore body, and a plurality of panel stopes (1-7) vertical to the vertical ore body are arranged between the vertical channel stopes. From Figure 2, it can be seen that this arrangement is different from Embodiment 1, and it can be seen that in this embodiment, the bottom stope C at the bottom of the mining panel is firstly mined by the comprehensive method, and the tailings are cemented after mining filling. The mining and filling operations of vertical slot stopes (A, B) and panel stopes (1-7) are the same as those in Embodiment 1, and will not be described again. In this embodiment, the bottom stope and the vertical groove stope are mined and filled to form a bottom weakening project and a vertical groove weakening project, which has a better effect on reducin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 