Continuously reinforced concrete road surface end portion treating method
A technology of reinforced concrete and end treatment, which is applied to cohesive pavement paved on site, roads, roads, etc., to achieve the effects of good anti-aging performance, simple maintenance and long service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] In order to ensure that the asphalt mixture on both sides of the expansion joint has sufficient compaction, the upper asphalt concrete is normally constructed after the concrete backing plate at the outer road end of the tunnel is pre-buried, and the mixture at the location of the expansion joint is removed when the expansion joint is installed. The specific steps for the installation of the mauler seam are as follows:
[0053] 1.) Slit slotting
[0054] ① On the pavement that has passed the inspection, draw the edge markings corresponding to the original reserved position. The markings should be straight and parallel to the axis of the expansion joint, but at the same time, avoid the distance between the markings being smaller than the width of the groove. The range of ~3mm is better, the reason is to prevent the settlement and deformation of the edge of the road surface during the installation process.
[0055] ② After the marking line is confirmed to be qualified, t...