Construction method for large-area inverse parking and accessible roof layer
A construction method and an inverted technology, applied in the direction of roof covering layer, roof, roof using sealing aggregates, etc., can solve the problems of easy bulging and cracking of the surface layer, wasting human resources, reducing economic benefits, etc. Cracking, economical cost saving, high economical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0034] The present invention will be further described below in conjunction with the embodiment of the roofing project of Jimo City Small Commodity City, Qingdao.
[0035] The implementation process of this invention is as follows:
[0036] 1. Clean up the grassroots
[0037] The protective layer of the roof insulation layer is the base layer of the roof surface, which is required to be flat and clean, and conform to the drainage slope of the roof. Clean up dust, debris, etc. at the base.
[0038] 2. Division of flow sections
[0039] Use the siphon rainwater drainage ditch, roof settlement joints and parapets on the roof to divide the roof surface into multiple construction areas, and the area of each construction area is about 800-1200m2 2 , the same construction area is divided into two small construction areas with basically the same area by the roof watershed. As the basis for sub-warehousing mold support.
[0040] 3. Construction setting out
[0041] Based on the...