Transmission environment dividing method and device based on existing network test data
A technology for disseminating environment and test data, applied in network planning, wireless communication, electrical components, etc., can solve problems such as inability to guarantee design quality, and achieve the effect of improving quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] In this embodiment, the above-mentioned second classification method is used to classify the propagation environment, that is, several distances are defined: three positions of near field, main coverage position and far field are defined.
[0071] Such as figure 2 A schematic flow chart of a propagation environment division method based on live network test data in an embodiment of the present invention, as shown in figure 2 As shown, the method of the embodiment of the present invention includes the following steps:
[0072] Step 102, collecting the current network engineering parameters and live network test data in the planning area, decomposing the live network test data to obtain the calibration file of the single cell;
[0073] In this step, the test data of the live network is obtained by using the receiving equipment and moving the test on the road, and the information to be recorded includes latitude and longitude and receiving field strength;
[0074] In t...
Embodiment 2
[0092] image 3 It is a schematic flowchart of a method for dividing a propagation environment based on live network test data according to another embodiment of the present invention.
[0093] In this embodiment, a city is used as an example to divide the propagation environment based on 800MHz CDMA network engineering parameters and test data, and apply it to the planning of a new network in the 2G frequency band.
[0094] Such as image 3 As shown, the propagation environment division method of the present invention comprises the following steps:
[0095] Step 201, determine the planning area, and determine the areas and sites to be tested for the 800MHz CDMA network according to the scope of the new network;
[0096] In this step, the planning area can be determined by a planning engineer.
[0097] Step 202, drive test the current network, perform a drive test on the 800MHz CDMA network, and obtain engineering parameters and test data;
[0098] In this step, the test r...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 