Spray device for heap-leaching field and spray technology therefor
A technology of heap leaching and spraying pipes, which is applied in the field of multi-line heap leaching field spraying devices and processes, intermittent and alternating, and can solve the problems of high metal concentration in leachate, high oxygen content in ore piles, and good spray uniformity. , to achieve the effects of reducing energy consumption and chemical reagent consumption, increasing metal concentration, and increasing leaching rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0030] When spraying with an intermittent, alternating, multi-line heap leaching field spray device and process provided by the patent of the present invention, first open the switching valve controlling main pipe I, close the switching valve controlling main pipe II, and spray for 6 hours Finally, close the switching valve controlling the main pipe I, open the switching valve controlling the main pipe II, and spray for another 6 hours. During the entire spraying process, the switch between the two switching valves has been repeated. The working pressure of the immersion liquid in the main pipe is controlled at 0.5 MPa, and the spray intensity is controlled at 12 L m -2 h -1 , the droplet diameter is controlled between 0.3-0.4 mm.
[0031]The invention patent provides an intermittent, alternating, multi-line heap leaching field spraying device and process to spray a uranium ore pile with a scale of 5264 t, which significantly improves the leaching efficiency and reduces the t...
Embodiment 1
[0033] Example 1, this patent has been applied to a heap leaching uranium mine in my country after a small test and an expanded test. The uranium ore pile: length × width × height = 52 × 18.2 × 3m, the ore loading capacity is 5264 t, and the uranium grade is 0.198%. The leaching solution is 20 g / L sulfuric acid solution, which is pumped to the high-level tank by a centrifugal pump, and the leaching solution flows out from the high-level tank, and the flow of the leaching solution is controlled through a valve. Turn off the switching valve of pipe I, close the switching valve controlling main pipe II, spray for 6 hours, then close the switching valve controlling main pipe I, open the switching valve controlling main pipe II, and spray for another 6 hours. During the process, the switch between the two switching valves has been repeated. The working pressure of the leaching solution in the main pipe is controlled at 0.5 MPa, and the spraying intensity is controlled at 12 L m -2...