Method for bridge-spanning construction by using tyre carrier

A transporter and tire-type technology, which is applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of large investment in 450T gantry crane equipment, increased construction links, complex foundation treatment, etc., to eliminate multiple major dangers source, reduce investment, and save investment

Active Publication Date: 2014-02-12
CHINA RAILWAY NO 9 GRP +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The investment in 450T gantry crane equipment is large, and the foundation treatment is complicated. After the box girder needs to be switched to the temporary pedestal by the transfer machine, it is then lifted by the beam lifting machine to the bridge and loaded on the truck, which increases the construction process and increases the construction cost.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for bridge-spanning construction by using tyre carrier
  • Method for bridge-spanning construction by using tyre carrier

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The present invention utilizes the bridge-crossing construction method of the tire-type transporter:

[0021] The steps are as follows: 1. Construction preparation.

[0022] 1.1. The design of the high-position tire-type transporter is an important construction process for the cross-bridge loading of the tire-type transporter. Its design directly affects the smooth progress of the transport frame beam and loading construction. In the design, in order to ensure the erection of the starting platform And the cross-bridge loading was carried out smoothly. Theoretical calculations were made on various construction conditions involved in the construction of the high-position tire-type handling machine, and the lifting height and span required by the tire-type handling machine were calculated.

[0023] 1.2. The construction site requirements for the erection of the box girder on the starting platform and the loading of vehicles across the bridge by the high-position tire-type ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for bridge-spanning construction by using a tyre carrier. The method comprises the following steps of: designing and manufacturing a high-altitude tyre carrier, erecting 3 box girders serving as an initial platform of a bridge girder erection machine by using the carrier, and hoisting the bridge girder erection machine and a girder transport vehicle on a bridge; loading girders on the girder transport vehicle by using the carrier in a mode of spanning the bridge; ensuring that the bridge girder erection machine and the girder transport vehicle return after lateral girder erection, hoisting the bridge girder erection machine and the girder transport vehicle down from the bridge, and making the bridge girder erection machine and the girder transport vehicle turn around; erecting 3 girders serving as an initial platform in an initial direction on the other side, and hoisting the bridge girder erection machine and the girder transport vehicle on the bridge; reserving 2 girders which are not erected between the initial platforms in the two girder erection directions, and using the 2 girders as a channel for the carrier to transversely enter the axis of the bridge; after the bridge girder erection machine and a girder transport vehicle finish erecting the girders, hoisting down from the bridge, and detaching; and erecting the last 2 box girders by using the carrier. The method has the advantages that: one high-altitude carrier is used to realize functions of two pieces of equipment, namely a carrier and a girder gantry crane in the conventional construction, and the cost is reduced; the tyre carrier directly loads the vehicle by spanning the bridge, and construction links are reduced; and the tyre carrier is used for directly loading the vehicle, so that the construction efficiency is improved.

Description

technical field [0001] The invention relates to a method for the construction of high-speed railways, when the box girder field is set on the bridge section, the box girder is reversed in the field by using a tire type transfer machine, the upper and lower bridges are hoisted by the bridge erecting machine and the beam transporter, and the box girder is installed across the bridge. The method of car construction. Background technique [0002] In the construction of high-speed railway box girder erection, when the girder field is located in the bridge section, two 450T gantry cranes are usually used to erect 3-5 pieces of box girders, which are used as the starting platform of the bridge erecting machine, and the hoisting of the bridge erecting machine and beam transport vehicles The loading of upper and lower bridges and box girders are all done by 450T gantry cranes. The beam yard needs to be additionally equipped with a tire-type handling machine to transport the box gird...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
Inventor 李润伟刘海东
Owner CHINA RAILWAY NO 9 GRP