Upside-down-hanging-preventing wide-temperate-zone oil well cement retarder
A technology of oil well cement and retarder, which is applied in the direction of drilling compositions, chemical instruments and methods, etc., and can solve problems such as long waiting time, prolonging on-site waiting time, super-retarding, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] The present invention will be described in detail below in conjunction with specific embodiments.
[0015] First, a binary copolymer is prepared. Add 24.81g of 2-acrylamido-2-methylpropanesulfonic acid and 5.19g of itaconic acid into 120g of deionized water, dissolve them and add them to a three-necked flask. Put the three-necked flask into a constant temperature water bath at 60°C and start stirring , and feed nitrogen into the three-necked flask for 30 minutes to exclude oxygen. After the temperature of the aqueous solution in the three-necked flask reaches 60 ° C, add 30 g of potassium persulfate initiator solution with a concentration of 2 wt % to allow the reaction to continue for 4 hours to obtain a binary Copolymer solution. The effective content of the solution is 16.67%.
[0016] Then, 21.5g tartaric acid was added to 180g binary copolymer solution and mixed uniformly to obtain 201.5g retarder sample 1. The number of parts by weight of binary copolymer in sa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
