Unlock instant, AI-driven research and patent intelligence for your innovation.
A method and device for building a compatibility testing platform
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology of compatibility testing and testing platform, applied in the testing field, it can solve the problem that the testing package cannot be tested, etc.
Active Publication Date: 2015-12-23
GUANGDONG OPPO MOBILE TELECOMM CORP LTD
View PDF3 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0004] The purpose of the embodiments of the present invention is to provide a method for building a compatibility test platform to solve the problem that some test packages cannot be tested when performing a CTS test in a windows environment
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment 1
[0018] figure 1 The process of building and implementing the compatibility test platform provided by the first embodiment of the present invention is shown, and the process is described in detail as follows:
[0019] Step S101, generating a test package in the android-cts suite for the windows environment.
[0020] The android-cts suite includes but not limited to android-cts-2.x.x suite, android-cts-4.0.x suite and android-cts-4.1 suite, where x includes numbers, letters and other symbols used for marking.
[0021] When an electronic product is developed and its own Android system is customized, it needs to pass the latest CTS test to ensure that the application program can run normally under the Android platform; after passing the CTS test, submit the test report to Google. Certification, the application program that has passed the CTS test is more superior and has a better user experience in the application process of the Android system.
[0022] The android-cts suite is ...
Embodiment 2
[0059] figure 2 The composition structure of the compatibility test platform construction device provided by the second embodiment of the present invention is shown, and for the convenience of description, only the parts related to the embodiment of the present invention are shown.
[0060] The device for building the compatibility test platform can be a software unit, a hardware unit, or a combination of software and hardware running in each terminal device (such as a computer), or it can be integrated into the terminal device as an independent pendant or run on the terminal device. In the application system of the terminal equipment.
[0061] The present embodiment provides a device for building a compatibility test platform, which may include a test package generation unit 21 and a control file generation unit 22, wherein each functional unit is described in detail as follows:
[0062] The test package generation unit 21 is used to generate the test package in the android...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention is applicable to the test field and provides a set-up method and a set-up device for a compatibility test platform. The set-up method comprises the following steps of: generating a test suite in an android-cts suite for a windows environment; and generating a control file for the compatibility test of the windows environment for carrying out the compatibility test, wherein the compatibility test is a CTS (Compatibility Test Suite) test. According to the set-up method and the sep-up device disclosed by the invention, the test suite which is applicable to the CTS test of the windows environment is generated, so that the CTS test is carried out under the windows environment, and the CTS test result report is generated, so that convenience is provided for a tester which is unfamiliar with the linux environment, and the test is more user-friendly.
Description
technical field [0001] The invention belongs to the field of testing, in particular to a method and device for building a compatibility testing platform. Background technique [0002] The compatibility test tool (CompatibilityTestSuite, CTS) is a compatibility test suite for Linux systems designed by Google, which is used to call the CTS suite in the Linux system for CTS testing; however, testers usually perform daily CTS in the Windows environment Therefore, it is necessary for each CTS tester to add a computer equipped with Linux system and set up a CTS environment for CTS testing. At the same time, testers are required to have the ability to work under the Linux system and command terminal Basic operation skills, including: file and test report transfer between Linux system and Windows system, switching between the above two different working systems is extremely inconvenient for testers, if the above two different working systems The system has a long distance, which wi...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.