A multi-step filling hydraulic support for the front roof beam
A technology of hydraulic support and front top beam, which is applied in the direction of mine roof supports, filling materials, mining equipment, etc., and can solve the problems of not forming a closed space for filling, unable to guarantee the solidification time of the rear filling, and unable to realize multi-step shifting. , to achieve the effect of ensuring the setting time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] In order to deeply understand the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0009] See attached figure 1 And attached figure 2 The rear end of the front top beam 1 of the front top beam multi-step filling hydraulic support provided by the present invention is a box body with an opening, the free end of the telescopic beam 3 extends into the box body, the rear end of the telescopic beam 3, the rear end The front end of the top beam 4 and the upper end of the upper link 7 are connected at one point, the front end of the telescopic beam jack 2 is connected to the front top beam 1, the rear end of the telescopic beam jack 2 is connected to the front end of the rear top beam 4, and the telescopic beam jack 2 Under the action of , the front top beam 1 produces relative movement relative to the telescopic beam 3, so that the front top beam 1 has a telescopic distance, a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 