Embodiment 1
[0024] Embodiment one: if figure 1 As shown, the cantilevered scaffold includes scaffold steel pipes, and the scaffold steel pipes include oblique scaffold steel pipes 3 and transverse scaffold steel pipes 4. The oblique and transverse scaffold steel pipes are connected by shear braces 5, and the shear braces 5 are located at Horizontal direction: the inclined scaffolding steel pipe 3 is installed on the frame beam 6 of the building through the No. 1 U-shaped steel plate 1, and the horizontal scaffolding steel pipe 4 is installed on the frame beam 6 of the building through the No. 2 U-shaped steel plate 2; The structure and material of the No. 1 and No. 2 U-shaped steel plates are the same, and the opening directions of the No. 1 and No. 2 U-shaped steel plates are all parallel to the horizontal plane; No. 1 U-shaped steel plate 1 is connected, and the transverse scaffold steel pipe 4 is connected with the above-mentioned No. 2 U-shaped steel plate 2 through the second positio...
Embodiment 2
[0029] Embodiment two: if figure 2 As shown, the cantilevered scaffold includes scaffold steel pipes, and the scaffold steel pipes include oblique scaffold steel pipes 9 and transverse scaffold steel pipes 10, the oblique and transverse scaffold steel pipes are connected by shear braces 11, and the shear braces 11 are located at Vertical direction: the inclined scaffold steel pipe 9 is installed on the frame column 12 of the building by No. 1 U-shaped steel plate 7, and the horizontal scaffold steel pipe 10 is installed on the frame column 12 of the building by No. 2 U-shaped steel plate 8 , the frame column 12 is fixedly connected with the floor 13 of the building; the structure and material of the No. 1 and No. 2 U-shaped steel plates are the same and both are located above the above-mentioned floor 13. The No. 1 and No. 2 U-shaped steel plates The opening directions of the steel plates are all perpendicular to the horizontal plane; the oblique scaffold steel pipe 9 is conn...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 