A construction method and technology of deep foundation pits, applied in infrastructure engineering, excavation, construction, etc., can solve the problems of low safety factor of construction environment, affecting the stability of earthwork slopes, and long construction period, so as to improve safety and improve work efficiency. Efficiency, accurate positioning effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] Such as figure 1 and figure 2 Shown, a kind of soil-rock geological deep foundation pit reverse docking construction method of the present invention, it comprises the following steps:
[0016] Step 1, excavating the earthwork at the upper part of the foundation pit to the rock layer 3 at the lower part of the foundation pit;
[0017] Step 2: construction of the upper structure 1 of the rock layer; construction of the upper structure 1 of the rock layer and the anti-beam 2, the upper structure and the anti-beam are poured as a whole, the inner ring structure is provided with structural reinforcement 4, and the outer ring anti-beam is provided with anchor reinforcement bars 5;
[0018] Step 3, earthwork backfilling, earthwork around the structure that has been constructed in the foundation pit;
[0019] Step 4, blasting the lower rock layer of the foundation pit;
[0020] Step 5: After the rock layer is excavated to the bottom layer by blasting, the substructure const...