Unlock instant, AI-driven research and patent intelligence for your innovation.

Grotto preliminary bracing construction method adopted when underground water seeps

A construction method and initial support technology, applied in underground chambers, drainage, earthwork drilling and mining, etc., can solve the problems of increasing the amount of sprayed concrete, increasing the accelerator, and high cost of the initial support method, and achieve rapid support , technically feasible effect

Active Publication Date: 2014-05-07
ANHUI SHUIAN CONSTR GRP CO LTD
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The object of the present invention is to provide a kind of cavern primary support construction method when there is groundwater seeping out, aiming at solving the problem that the cost of primary support methods such as the combination of simple plugging and draining, increasing the amount of quick-setting agent and increasing the amount of sprayed concrete is relatively high. high problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Grotto preliminary bracing construction method adopted when underground water seeps

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] In order to make the objectives, technical solutions, and advantages of the present invention clearer, the following further describes the present invention in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.

[0017] figure 1 Shows the flow of the construction method for the initial support of the cavern when groundwater seeps out of the present invention. As shown in the figure, the present invention is realized in this way, a construction method for the initial support of the cavern when groundwater seeps out include:

[0018] S101: When the local sewage gushes or seeps in spots, use waste rubber pipes for drainage, wrap the nozzles with highly permeable geotextiles, align the nozzles with the gushing or seepage ports, and tie the pipes with lead wire around the rubber pipes. The sleeve is fixed...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a grotto preliminary bracing construction method adopted when underground water seeps. When the underground water gushes or seeps like dots, a pipe orifice of a rubber pipe is sawed into a bevel, the pipe orifice is wrapped in geotexile fabric with high water permeability, and the oblique pipe orifice of the rubber pipe is aligned with a water gushing port. When the underground water gushes or seeps like a line, a water-permeable pipe section is wrapped in the geotexile fabric with high water permeability, the water-permeable pipe section is pressed on the line-shaped water gushing port, a lead wire is wound around the rubber pipe, so that the rubber pipe is bound to form a pipe sleeve, and the pipe sleeve is fixed to a rock face through a long steel nail. When the underground water gushes or seeps like a surface, the underground water is collected through a rubber horn mouth. After a drainage facility is arranged, concrete is sprayed in time for bracing, wherein the concrete is sprayed along the circumference of the water gushing port in circles first, and the spray circles are reduced towards the water gushing port step by step till the drainage facility, except the exposed section, is embedded into the concrete. The grotto preliminary bracing construction method adopted when the underground water seeps has the advantages that according to different underground water conditions and the blockage and drainage combination principle, the anchor-plate retaining technology is improved, and the preliminary bracing effects of technical feasibility, quick bracing, economical efficiency and practicability are achieved.

Description

Technical field [0001] The invention belongs to the technical field of bolting and shotcrete support, and particularly relates to a construction method for initial support of a cavern when groundwater seeps out. Background technique [0002] The biggest problem during the construction of underground caverns is the influence of groundwater on the stability of caverns, especially soft rock (soil) caverns. Groundwater is an important reason for the collapse and shedding of surrounding rock (soil) on the cave wall. The cave must be excavated as soon as possible Implement the initial support of the cavern. However, there is still no good method for groundwater treatment. In the initial implementation of sprayed concrete support, due to the effect of water seepage, the support effect is poor, resulting in greater collapse under the effect of underground water seepage. [0003] The existing methods are mainly to take simple measures such as the combination of blockage and drainage, incre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21F16/00E21D11/10E21D21/00
Inventor 杨毅阮旭芳
Owner ANHUI SHUIAN CONSTR GRP CO LTD