Grotto preliminary bracing construction method adopted when underground water seeps
A construction method and initial support technology, applied in underground chambers, drainage, earthwork drilling and mining, etc., can solve the problems of increasing the amount of sprayed concrete, increasing the accelerator, and high cost of the initial support method, and achieve rapid support , technically feasible effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] In order to make the objectives, technical solutions, and advantages of the present invention clearer, the following further describes the present invention in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.
[0017] figure 1 Shows the flow of the construction method for the initial support of the cavern when groundwater seeps out of the present invention. As shown in the figure, the present invention is realized in this way, a construction method for the initial support of the cavern when groundwater seeps out include:
[0018] S101: When the local sewage gushes or seeps in spots, use waste rubber pipes for drainage, wrap the nozzles with highly permeable geotextiles, align the nozzles with the gushing or seepage ports, and tie the pipes with lead wire around the rubber pipes. The sleeve is fixed...
PUM
Login to View More Abstract