[0020] In this example, lime-dried sludge was obtained from a sewage treatment plant in Beijing, and other cement raw materials including limestone, sandstone, and fly ash were obtained from a cement factory in Beijing, and the test site was a cement factory in Beijing.
[0021] 1) Carry out full chemical analysis of lime drying sludge and other cement raw materials including limestone, sandstone, fly ash, etc. Table 1 shows the chemical composition of each component of the raw meal.
[0022] Table 1 Full chemical analysis of raw materials (mass fraction / %)
[0023]
[0024] 2) Raw ingredients. The rate values used in this embodiment are KH=0.91±0.01, SM=2.6±0.1, IM=1.5±0.1. First determine the amount of sludge added, and then determine the ratio of other raw materials according to the requirements of the rate value. In this embodiment, the amount of lime-dried sludge added is 0%, 5.0%, 10.0%, 15.0%, 20.0%, respectively. 25.0%, and 30.0%, according to the dosage from l...
Embodiment 2
[0041] Sludge after lime drying treatment of a sewage treatment plant in Beijing is used to burn cement. Take 10kg of lime-dried sludge that has been dried to a moisture content of less than 3%, and the rate values are KH=0.94, SM=2.37, and IM=1.30. After the lime dried sludge is blended into the raw meal at a dosage of 15%, the cement clinker is fired at 1400 ° C, and gypsum is added to grind it together to make cement. In the end, all the chemical and physical indexes of the obtained cement meet the ex-factory standards stipulated in GB175-2007.
Embodiment 3
[0043] Sludge after lime drying treatment of a sewage treatment plant in Beijing is used to burn cement. Take 100kg of lime-dried sludge that has been dried to a moisture content of less than 3%, and the rate values are KH=0.88, SM=2.40, and IM=1.40. After the lime dried sludge is blended into the raw meal at a dosage of 20%, the cement clinker is fired at 1400 ° C, and gypsum is added to grind it together to make cement. In the end, all the chemical and physical indexes of the obtained cement meet the ex-factory standards stipulated in GB175-2007.