Underground fire prevention and grouting nitrogen injection pipeline in coal mine and its removal method when withdrawing
A technology of fire prevention and grouting, which is applied in the direction of fire prevention, dust prevention, mining equipment, etc. It can solve the problems that the pipeline cannot be extended into the old pond, the degree of danger is high, and the difficulty of dismantling is difficult, so as to improve the safety factor and improve the work Process, the effect of improving production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Such as figure 1 As shown, the underground coal mine fire-fighting grouting and nitrogen injection pipeline includes the tail support frame 1, the auxiliary conveying lane grouting iron pipe 4, and the auxiliary conveying lane nitrogen injection iron pipe 5, as well as the grouting hose 2, nitrogen injection The hose 3, the tail fixed grouting iron pipe 6 and the tail fixed nitrogen injection iron pipe 7; the tail frame fixed grouting iron pipe 6 and the tail frame fixed nitrogen injection iron pipe 7 are fixedly installed in the The side of the base of the tail support 1; the auxiliary lane grouting iron pipe 4 and the auxiliary lane nitrogen injection iron pipe 5 are fixedly installed on the side wall of the auxiliary lane; one end of the grouting hose 2 is connected to the auxiliary lane The roadway grouting iron pipe 4 is connected, and the other end is connected with the fixed grouting iron pipe 6 of the tail frame; one end of the nitrogen injection hose 3 is connec...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 