Unlock instant, AI-driven research and patent intelligence for your innovation.

Connection management method and access network elements

A connection management and access network technology, applied in connection management, electrical components, wireless communication, etc., can solve problems such as inability to manage multiple connections

Inactive Publication Date: 2015-02-25
ZTE CORP
View PDF3 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The present invention provides a connection management method and an access network element, so as to overcome the existing defect of being unable to manage multiple connections

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Connection management method and access network elements
  • Connection management method and access network elements
  • Connection management method and access network elements

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach 1

[0123] Figure 5 It is a schematic diagram of a dual connectivity radio interface control plane architecture in this implementation manner. The radio resource control (RRC) entity is deployed on the main connection node and the UE, and the RRC entity on the main connection node and the UE implements all RRC functions in the existing LTE system, including the sending and receiving of system broadcast messages and all functions controlled by the RRC connection. RRC entities can be deployed on resource connection nodes (such as Figure 5 shown in the gray dotted box), or the RRC entity may not be deployed. For the case where the RRC entity is not deployed on the resource connection node, the main connection node is responsible for the transmission of RRC messages with the UE; for the case where the RRC entity is deployed on the resource connection node, except that the RRC message can be transmitted between the main connection node and the UE In addition, RRC messages can also...

Embodiment 1

[0125] This example applies image 3 In the scenario shown, the UE originally established a dual connection between the primary connection node and the resource connection node. Afterwards, the UE detected that the signal quality of the cell (cell 2) covered by the resource connection node where the UE is located deteriorated, and it was no longer suitable for the UE to continue to use the resource connection node. The connection is maintained on the resource connection node, and in this embodiment, the primary connection node decides to move the connection between the UE and the resource connection node to the primary connection node. Such as Figure 6 As shown, the connection management method specifically includes:

[0126] 601. The UE reports a measurement report to the primary connection node. The measurement report includes the measurement results of cell 2;

[0127] 602. After receiving the measurement report, the main connection node decides to move the connection o...

Embodiment 2

[0143] This embodiment is applicable to UE that originally established a dual connection between the main connection node and the resource connection node. Since the business traffic drops, in order to reduce the UE and network overhead, it is necessary to remove the connection between the UE and the resource connection node and return to the single connection. Connected state scenarios. In this embodiment, the primary connection node determines that the connection between the UE and the resource connection node needs to be deleted. Such as Figure 7 As shown, the connection management method specifically includes:

[0144] 701. The main connection node determines that the service flow has decreased, and when the data transmission between the UE and the resource connection node ends, the main connection node decides to delete the connection of the UE on the resource connection node;

[0145] 702. The primary connection node sends a connection reconfiguration request to the r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Disclosed are a connection management method and an access network element. The method is applied to a scenario where a user equipment (UE) establishes a connection with at least two access network elements at the same time, comprising: when determining that at least a portion of the connections between the UE and a resource connection node are required to be deleted or removed, a main connection node indicates the resource connection node to correspondingly delete or remove the at least a portion of the connections, and the resource connection node or the main connection node indicates the UE to correspondingly delete or remove the at least a portion of the connections. The embodiments of the present invention achieve the connection management between the UE and the resource connection node under a dual-connection architecture, in particular achieves the connection management when the resource connection node is no longer suitable for providing information transmission for the UE or is no longer suitable for providing information transmission of all the connections established before for the UE.

Description

technical field [0001] The invention relates to the field of mobile communication, in particular to a connection management method and an access network element. Background technique [0002] Since the development of the first-generation mobile communication system in the 1980s, mobile communication technology has entered the era of 4G (4th generation mobile communication technology), and users' mobile communication needs have also experienced a change from a single voice service to voice and basic data. In the course of the explosive growth of business and data services, mobile communication has gradually risen to the current mobile Internet era. In the era of mobile Internet, the demand for new mobile applications, especially those with high quality, high speed and low latency, has experienced explosive growth. According to the forecast of the International Telecommunications Union (International Telecommunications Union, referred to as ITU), From 2010 to 2015, the mobile...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04W76/04
CPCH04W76/04H04W76/34H04W76/11H04W76/15H04W88/06H04W76/22
Inventor 施小娟黄亚达杜忠达
Owner ZTE CORP