A concrete face rockfill dam face split structure and its construction method
A technology for concrete panels and construction methods, applied in water conservancy projects, marine engineering, construction, etc., can solve problems such as mutual extrusion of panels, hidden dangers of engineering safety, improper panel separation, etc., to avoid extrusion damage, improve safety performance, The effect of saving maintenance costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0025] A concrete face rockfill dam face split joint construction method, including the steps of determining the length of the compression zone, determining the longitudinal displacement, calculating the split joint width, calculating the number of split joints, and processing the split joints, specifically as follows:
[0026] (1) Determine the length L of the compression zone. Using engineering analogy or three-dimensional stress-deformation analysis to analyze the working state of the concrete panel, the length of the compressive stress area N is the length L of the compression area;
[0027] (2) Determine the longitudinal displacement B of the dam body. The longitudinal displacement B of the dam along the axial direction is analyzed by engineering analogy or three-dimensional stress-deformation analysis.
[0028] (3) Calculate the split width b. For the convenience of construction, the seam width should not be too small or too large, the minimum seam width is 5mm, and th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 