Flexible debris retaining dam structure and construction method thereof
A construction method and flexible technology, applied in the direction of barrages, dams, weirs, etc., to achieve the effects of simple construction, low cost and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0019] Such as figure 1 and figure 2 As shown, a flexible dam structure of the present invention includes a dam 1 built on the covering layer foundation 4, and the dam 1 is gradually retreated from each layer of steel gabion 2 from bottom to top. 1.0m or 0.5m stacked, the steel gabions 2 between each layer are arranged in dislocation, and the adjacent steel gabions 2 are welded with short bars to form a whole stepped dam body, at the bottom of the stepped dam body Set the drainage culvert 3. see image 3 , the reinforced gabion 2 is composed of a rectangular reinforced cage 2.1 and a reinforced mesh cover 2.2 arranged on the top of the rectangular reinforced cage 2.1, the size of the reinforced gabion 2 can be made according to the on-site construction, generally the size of the reinforced gabion 2 is 2m × 1.5m × 1m or 2m × 2m × 1m, the steel gabion 2 can be made by welding steel bars with a diameter of φ16, φ18 or φ20, where the spacing between the steel bars is 10-20...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 