Inner tube hanging sheet replacement construction method for preheater cyclone of cement clinker production line
A technology of cement clinker and construction method, which is applied in the direction of preheating costs, lighting and heating equipment, furnaces, etc., which can solve the problems of long replacement construction time, high safety risks, and large investment of personnel, so as to save manpower and simplify the construction system , to ensure the effect of construction safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] Embodiment 1, a construction method for replacing the inner cylinder of the preheater cyclone of the cement clinker production line, is characterized in that it includes the following steps:
[0019] Firstly, limit the construction site site and working environment to the allowable scope of construction, reasonable layout and specification range, so that the signs are clear and complete, all kinds of signs are eye-catching, and the construction site is clean and civilized.
[0020] Then harden the roads at the construction site, and often sprinkle water on the construction roads in sunny days to prevent dust from flying and pollute the surrounding environment.
[0021] 1) According to the site conditions, use a crane or a hoist to reverse the inner tube hanging piece to the designated position on the preheater;
[0022] 2) Press down the heavy hammer flap valve of the feeding chute to be replaced and lock it with a 1T gourd to prevent the upper crust from collapsing and...
Embodiment 2
[0032] Embodiment 2, a construction method for replacing the hanging piece of the inner cylinder of the preheater cyclone of the cement clinker production line, is characterized in that it includes the following steps:
[0033] Firstly, limit the construction site site and working environment to the allowable scope of construction, reasonable layout and specification range, so that the signs are clear and complete, all kinds of signs are eye-catching, and the construction site is clean and civilized.
[0034] Then harden the roads at the construction site, and often sprinkle water on the construction roads in sunny days to prevent dust from flying and pollute the surrounding environment.
[0035] 1) According to the site conditions, use a crane or a hoist to reverse the inner tube hanging piece to the designated position on the preheater;
[0036] 2) Press down the heavy hammer flap valve of the feeding chute to be replaced and lock it with a 1T gourd to prevent the upper crus...