A Time-of-Use Power Price Optimization Method for Distribution Networks Considering Reliability
A time-of-use electricity price and optimization method technology, applied in the direction of calculation, calculation model, data processing application, etc., can solve problems such as ignoring user reliability requirements, and achieve the effects of improving operating efficiency, reducing operating costs, and reducing peak-to-valley differences
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] Below by embodiment, in conjunction with accompanying drawing, the technical scheme of the present invention is described in further detail:
[0046] figure 1 It is a specific flow chart of the time-of-use power price optimization method for distribution network considering reliability provided by the present invention
[0047] 1. Read load data, including user name, electricity consumption category, industry classification, load nature, user's daily active power curve for a month, read the load data of Nanjing Olympic Sports Bianmuxi#1 Line, Muxi#1 The line load is mainly composed of commercial, office building and residential loads.
[0048]
[0049] Table 1 The composition of the load carried by the Aoti Bianmuxi#1 line
[0050] The typical load curves of the three types of loads and the typical light industry load curves are obtained by fitting the large amount of load data in the Hexi area of Nanjing by the least square method.
[0051] 2. Read the time-of-...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


