Method for controlling optimal hydropower station flood period water level range of cascaded hydropower stations
A cascaded hydropower station group and control method technology, which is applied in the direction of liquid level control, non-electric variable control, control/regulation system, etc., can solve the problem of large differences in flood resistance, different safety degrees, and reduced water energy utilization in flood seasons, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0049] The present invention will be described in further detail in conjunction with the accompanying drawings and specific embodiments.
[0050] Such as figure 1 As shown, the optimal water level range control process of cascade hydropower station group hydropower stations in flood season is as follows: firstly, the inflow flow frequency curve and the expected water abandonment risk of hydropower stations at all levels are given in advance, and then the hydropower stations are calculated in sequence from upstream to downstream: if If the hydropower station has the above-mentioned performance of seasonal adjustment, then calculate the optimal water level and the expected total discharge flow of the hydropower station for the first-level and non-first-level hydropower stations respectively; The outflow of the hydropower station. After traversing all hydropower stations in turn, the optimal water level range of all hydropower stations above the seasonal regulation performance o...