An installation method and a large-span technology, which can be used in construction, building structure, construction material processing, etc., can solve the problems of prolonged construction period, difficulty in hoisting by pieces, and increased construction cost, saving construction time and reducing construction costs. cost and the effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below in conjunction with the accompanying drawings.
[0023] In the figure, the method for installing a plurality of evenly distributed thin tie rods on a large-span roof of the present invention includes the following construction steps:
[0024] Step one as figure 1 , 2 As shown, roof purlin inspection; according to the design requirements, check the installation process and quality of roof beam 1 and roof purlin 2;
[0025] Step two as image 3 , 4 As shown in the figure, set up the rod roof transportation device; the longitudinal distance between the roof purlins 2 is 1~2m, and the weight of a single rod 6 is about 1~2kg. In the longitudinal direction of the four roof purlins 2 on the roof and perpendicular to the longitudinal centerline of the roof purlins 2, the groove of the cable bridge is upward and the openings at both ends are welded and sealed with steel plates to form a roof transportation device 3 with a...