A method for the production and construction of concrete pipe piles
A technology for concrete pipe piles and construction methods, which is applied to sheet pile walls, solid waste management, infrastructure engineering, etc. Good pile quality effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0010] A method for producing and constructing concrete pipe piles, comprising the steps of:
[0011] Drill and clean the hole; pour infiltration solution and vibrate for 15 hours; clean the hole again and put the steel cage and concrete;
[0012] The permeation solution is composed of the following raw materials in parts by weight: cement 160, fly ash 120, slag powder 180, diatomaceous earth 22, water 550, acrylic acid emulsion 18, and lignosulfonate 20.
[0013] The diatomaceous earth is first-grade diatomaceous earth. The slag powder is S75 grade. The fly ash is Class I fly ash. When drilling, add drilling mud, which is composed of the following raw materials in parts by weight: water 100, bentonite 22, soda ash 3, relative density 1.05-2, and sand content less than 7%.
[0014] According to the existing national standard for quality inspection, the result is qualified.
Embodiment 2
[0016] A method for producing and constructing concrete pipe piles, comprising the steps of:
[0017] Drill and clear the hole; pour infiltration solution and vibrate for 18 hours; clear the hole again and put the steel cage and concrete;
[0018] The permeation solution is composed of the following raw materials in parts by weight: cement 180, fly ash 115, slag powder 190, diatomaceous earth 28,600, acrylic acid emulsion 20, and lignosulfonate 28.
[0019] The diatomaceous earth is first-grade diatomaceous earth. The slag powder is S75 grade. The fly ash is Class I fly ash. When drilling, add drilling mud, which is composed of the following raw materials in parts by weight: water 100, bentonite 25, soda ash 5, relative density 1.05-2, and sand content less than 7%.
[0020] According to the existing national standard for quality inspection, the result is qualified.
Embodiment 3
[0022] A method for producing and constructing concrete pipe piles, comprising the steps of:
[0023] Drill and clean the hole; pour infiltration solution and vibrate for 22 hours; clean the hole again and put steel cage and concrete;
[0024] The permeation solution is composed of the following raw materials in parts by weight: cement 150, fly ash 130, slag powder 170, diatomite 25, water 500, acrylic acid emulsion 25, and lignin sulfonate 15.
[0025] The diatomaceous earth is first-grade diatomaceous earth. The slag powder is S75 grade. The fly ash is Class I fly ash. When drilling, add drilling mud, which is composed of the following raw materials in parts by weight: water 100, bentonite 28, soda ash 2, relative density 1.05-2, and sand content less than 7%.
[0026] According to the existing national standard for quality inspection, the result is qualified.