Construction device and method for concrete face dam water stop mortar bed
一种施工装置、面板坝的技术,应用在水利工程、海域工程、基础结构工程等方向,能够解决难保证砂浆垫层平整等问题,达到结构实用安全可靠、确保质量、简化施工工序的效果
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] Such as figure 1 Among them, the overall structure of the mortar cushion layer 7 and the copper water-stop sheet 3 located at the joint of the dam body is as follows: a mortar cushion layer 7 is provided in the mortar cushion layer groove 1, a PVC gasket 2 is arranged on the mortar cushion layer 7, PVC The gasket 2 is provided with a copper waterstop 3, the copper waterstop 3 is provided with a composite waterstop 4, and a rubber rod 5 is provided at the bend of the nose of the copper waterstop 3, and the nose of the copper waterstop 3 The inside is also filled with polyurethane foam filler 6. The installation quality of the copper water stop 3 is closely related to the quality of the mortar cushion 7.
[0029] Such as figure 2 Among them, a face dam water-stop mortar cushion construction device includes a vehicle frame 8, the vehicle frame 8 is connected with an electric winch 17 installed on the dam crest through a traction wire rope 16, and the center line of the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 