Preparation method for double-metal composite sliding plate of automobile air-conditioning compressor and moulds
A technology for automotive air conditioners and compressors, which is applied in the field of preparation of bimetallic composite sliding discs for automotive air conditioner compressors, which can solve the problems of complex sintering and compact equipment, complicated process, and low efficiency, and achieve simplified production procedures and easy operation Line, high efficiency effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] The first step, substrate processing
[0061] Process the base body of the slide plate according to the requirements of the slide plate;
[0062] The second step, the surface is copper plated or sprayed with an adhesive layer
[0063] Plating copper or spraying an adhesive layer on the surface of the substrate;
[0064] The third step, powder sintering
[0065] First fix the retaining ring and the base of the sliding disc, then lay copper powder on one side of the base, then buckle the sintered bottom mold with adhesive liquid on the surface, make the sintered bottom mold press the copper powder, turn it over and lay the other side of copper powder, Put the bottom mold together with the retaining ring and the substrate covered with copper powder into a sintering furnace protected by a decomposed ammonia atmosphere for sintering. The sintering temperature is controlled at 820°C and the sintering time is controlled at 150 minutes;
[0066] The fourth step, rolling and ...
Embodiment 2
[0073] The first step, substrate processing
[0074] Process the base body of the slide plate according to the requirements of the slide plate;
[0075] The second step, the surface is copper plated or sprayed with an adhesive layer
[0076] Plating copper or spraying an adhesive layer on the surface of the substrate;
[0077] The third step, powder sintering
[0078] First fix the retaining ring and the base of the sliding disc, then lay copper powder on one side of the base, then buckle the sintered bottom mold with adhesive liquid on the surface, make the sintered bottom mold press the copper powder, turn it over and lay the other side of copper powder, Put the bottom mold together with the retaining ring and the substrate covered with copper powder into a sintering furnace protected by a decomposed ammonia atmosphere for sintering. The sintering temperature is controlled at 880°C and the sintering time is controlled at 90 minutes;
[0079] The fourth step, rolling and c...
Embodiment 3
[0086] The first step, substrate processing
[0087] Process the base body of the slide plate according to the requirements of the slide plate;
[0088] The second step, the surface is copper plated or sprayed with an adhesive layer
[0089] Plating copper or spraying an adhesive layer on the surface of the substrate;
[0090] The third step, powder sintering
[0091] First fix the retaining ring and the base of the sliding disc, then lay copper powder on one side of the base, then buckle the sintered bottom mold with adhesive liquid on the surface, make the sintered bottom mold press the copper powder, turn it over and lay the other side of copper powder, Put the bottom mold together with the retaining ring and the substrate covered with copper powder into a sintering furnace protected by a decomposed ammonia atmosphere for sintering. The sintering temperature is controlled at 840°C and the sintering time is controlled at 120 minutes;
[0092] The fourth step, rolling and ...