Installation and construction method of standing stones for avoiding inspection wells
A construction method and technology for standing edge stones, applied in the direction of side ditch/curb stone, etc., can solve the problems of complicated underground pipelines, conflicts between pipeline inspection wells and expressway edge stones, affecting the overall aesthetics of the sidewalk width and road, etc. Social benefits and the effect of ensuring overall aesthetics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The method of the present invention is described in detail below with reference to the accompanying drawings.
[0025] As shown in the accompanying drawings, the construction method of the present invention is to use a 10cm thick cover plate of the same material as the curb stone, first use the "concave" installation method to bypass the verge stone around the inspection well, and drop the verge stone 11cm at the same time , Process the cover plate according to the actual size, install the cover plate on the upper part of the inspection well, lay a 1cm thick rubber pad on the lower part of the cover plate to facilitate the opening of the cover plate, and use border stones with a thickness of 10cm and a width of 10cm to ensure that the cover plate is installed. Afterwards, it is flush with the standing stone of the standard section. The specific construction steps are as follows: check the installation of the manhole cover → installation of the vertical edge stone → pref...