Cold region tunnel heat production and water collection device
A technology for water collection devices and tunnels in cold regions, applied in tunnels, tunnel linings, safety devices, etc., can solve problems such as high cost, low efficiency, and impact on structural durability, and achieve ingenious device design, save engineering costs, and save manpower Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] combine Figure 8 , using the tunnel heat production and water collection device of the present invention to carry out water collection and diversion treatment on the Dongnanli Tunnel on the Tumen to Hunchun Expressway Project in Jilin Province in the warm season, several leaking water points in the entire tunnel have been installed The utility model relates to a water collecting component in the tunnel heat generating water collecting device. The installation angles are all concentrated in the range from vertical to 30° from vertical. The placement positions are all at the water leakage points near the tunnel vault.
[0061] The specific size of the water collection components used: in summer, the main function of this structure is to divert water from seepage, and the size requirements are relatively small. The size used this time is 101-the diameter of the sump is 65mm, and the height is 40mm. 102 - The diameter of the drain pipe is 20mm. 103 - fixed guide rod di...
Embodiment 2
[0065] combine Figure 9 , adopt the tunnel heat production and water collection device of the present invention to carry out water collection and heating treatment on Dongnanli Tunnel on the Tumen to Hunchun Expressway Project in Jilin Province in winter, and several leaking water points in the whole tunnel have installed this The water collecting component in the tunnel heat generating water collecting device. The installation angles are all concentrated in the range from vertical to 30° from vertical. The placement positions are all at the water leakage points near the tunnel vault.
[0066] The specific size of the water collection components used: in summer, the main function of this structure is to divert water from seepage, and the size requirements are relatively small. The size used this time is 101-the diameter of the sump is 65mm, and the height is 40mm. 102 - The diameter of the drain pipe is 20mm. 103 - fixed guide rod diameter 10mm, length 400mm.
[0067] Fo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


