[0015] The present invention will be further described below in conjunction with specific embodiment:
[0016] A construction method for a bathroom floor structure, characterized in that it comprises the following steps:
[0017] The first step is to lay the SCL anti-seepage membrane on the base, and pour a 35-45mm cement mortar layer on the SCL anti-seepage membrane. The cement mortar layer forms a concave surface centered on the floor drain;
[0018] The second step is to lay water filter bricks on the mortar layer, apply a leveling layer on the water filter bricks, and install floor heating pipes on the leveling layer;
[0019] The third step is to lay an insulation layer above the floor heating water pipe, and the insulation layer is formed by bonding phase change material particles;
[0020] In the fourth step, a cobblestone-like protrusion formed by a phase change material is laid on the insulation layer, and is fixed on the insulation layer by fusing the hydrophobic ma...