A frame for high-throw concrete-filled steel tube construction and its application method
A concrete-filled steel tube and concrete technology, which is applied to the accessories of scaffolding, scaffolding supported by house structure, construction, etc., can solve problems such as easy occurrence of safety accidents, and achieve the effect of shortening construction period, saving labor, and reducing construction cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Examples see figure 1 As shown, a frame for concrete-filled steel tube high-throw pouring includes a tool-type steel platform 1 and a tool-type curb 2, and the tool-type steel platform and tool-type curb are used to pour concrete-filled steel tubes. The outer frame structure of the main building of this project adopts steel pipe concrete columns from the 5th floor. The inside of the steel pipe columns is self-compacting concrete. The platform and the horseway are poured with concrete filled steel tubes by hydraulic distributors.
[0027] Examples see figure 2 and image 3 As shown, the tool-type steel platform is shaped and processed. The steel platform skeleton 11 is composed of platform steel beams 13 welded by [16a channel steel and L63×5.0 angle steel. Protective railing 31 is set, and protective railing 31 adopts around 60×3.5mm and 40×3mm round steel welded, 1.5m high, protective railing 31 covered with 30×30×3.5mm steel wire mesh 32. Four lifting rings a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


