A multi-section bridge pouring equipment and construction method thereof
A bridge pouring and equipment technology, applied in bridge construction, bridge, erection/assembly of bridges, etc., can solve problems such as low efficiency, difficult implementation, and a large number of manpower
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] As shown in the figure, a multi-section bridge pouring equipment includes module one 1 and module two 2, on which a bridge pouring module 3, erection module equipment 5, and upper bridge pouring module 6 are placed.
[0038] Module one 1 includes panel one 19, hydraulic cylinder one 13 is evenly installed on the bottom of said panel one 19, guide rail two 18, erecting module guide rail one 16, and module groove column 15 are arranged from top to bottom on both sides of said panel one 19 , guide rail one 12; clasp one 17 is installed between described erection module guide rail one 16 and guide rail one 12; described clasp one 17 is equipped with connection device one 14; described connection device one 14 is provided with energy itself Open the spring one 11 that makes module one 1 and module two 2 separate.
[0039] The module two 2 includes a panel two 29, and the bottom of the panel two 29 is evenly equipped with a hydraulic cylinder two 21, and the two sides of the ...
Embodiment 2
[0053] As shown in the figure, a multi-section bridge pouring equipment includes module one 1 and module two 2, on which a bridge pouring module 3, erection module equipment 5, and upper bridge pouring module 6 are placed.
[0054] Module one 1 includes panel one 19, hydraulic cylinder one 13 is evenly installed on the bottom of said panel one 19, guide rail two 18, erecting module guide rail one 16, and module groove column 15 are arranged from top to bottom on both sides of said panel one 19 , guide rail one 12; clasp one 17 is installed between described erection module guide rail one 16 and guide rail one 12; described clasp one 17 is equipped with connection device one 14; described connection device one 14 is provided with energy itself Open the spring one 11 that makes module one 1 and module two 2 separate.
[0055] The module two 2 includes a panel two 29, and the bottom of the panel two 29 is evenly equipped with a hydraulic cylinder two 21, and the two sides of the ...
Embodiment 3
[0070] As shown in the figure, a multi-section bridge pouring equipment includes module one 1 and module two 2, on which a bridge pouring module 3, erection module equipment 5, and upper bridge pouring module 6 are placed.
[0071] Module one 1 includes panel one 19, hydraulic cylinder one 13 is evenly installed on the bottom of said panel one 19, guide rail two 18, erecting module guide rail one 16, and module groove column 15 are arranged from top to bottom on both sides of said panel one 19 , guide rail one 12; clasp one 17 is installed between described erection module guide rail one 16 and guide rail one 12; described clasp one 17 is equipped with connection device one 14; described connection device one 14 is provided with energy itself Open the spring one 11 that separates the module one 1 and the module two 2 , and the module groove bar 15 is provided with a hasp hole 151 .
[0072] The module two 2 includes a panel two 29, and the bottom of the panel two 29 is evenly ...