A kind of asphalt mixture prepared by using coal direct liquefaction residue and preparation method thereof
A technology of direct coal liquefaction and asphalt mixture, applied in the field of road engineering, can solve problems such as poor low temperature performance, inability to improve other properties of asphalt concrete, and difficulty in meeting road performance requirements, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0071] Embodiment 1 prepares asphalt mixture additive
[0072] 1) Carry out elemental analysis on the coal direct liquefaction residue, and compare the obtained elemental analysis results with the elemental analysis results of high-quality asphalt;
[0073] 2) Determine the weight ratio of coal direct liquefaction residue, crosslinking agent, accelerator, adhesive and plasticizer according to the comparison results;
[0074] 3) Prepare raw materials (kg) according to the following weight ratio:
[0075] Coal direct liquefaction residue 55, alkyl phenolic resin 35, octadecanoic acid 0.01, random polypropylene 5, paraffin oil 0.5;
[0076] The coal direct liquefaction residue, alkyl phenolic resin, octadecanoic acid, and random polypropylene are respectively pulverized into 80-mesh powder through a Raymond mill;
[0077] 4) placing coal direct liquefaction residue powder, alkylphenol-formaldehyde resin powder, octadecanoic acid powder and random polypropylene powder in a high-...
Embodiment 2
[0084] Embodiment 2 prepares asphalt mixture additive
[0085] Except step 3) Prepare raw materials (kg) according to the following weight ratio: coal direct liquefaction residue 90, p-tert-butylphenol-acetylene resin 10, sulfenamide accelerator 0.45, polyvinyl butyral 7, castor oil 1; pulverize coal direct liquefaction residue, p-tert-butylphenol-acetylene resin, sulfenamide accelerator, polyvinyl butyral into 90 mesh powder; step 4) coal direct liquefaction residue powder, p-tert Add butylphenol-acetylene resin powder, sulfenamide accelerator powder, and polyvinyl butyral powder into a high-speed mixer for stirring and mixing to obtain the first mixture; wherein, the stirring speed is 50r / min, and the stirring speed The time is 10min; step 5) heating the castor oil to 75°C; step 6) adding the heated castor oil to the first mixture for kneading treatment to obtain the second mixture; wherein, the temperature of the kneading treatment is 120°C, and the kneading treatment The ...
Embodiment 3
[0086] Embodiment 3 prepares asphalt mixture additive
[0087] In addition to step 3) raw materials (kg) are prepared according to the following weight ratio: coal direct liquefaction residue 60, chlorinated paraffin resin 15, thiuram accelerator 0.05, reclaimed rubber 15, coal tar 5; coal direct liquefaction residue, chlorine The chemical paraffin resin, thiuram accelerator, and reclaimed rubber are respectively pulverized into 100-mesh powder by Raymond mill; step 4) directly coal liquefaction residue powder, chlorinated paraffin resin powder, thiuram accelerator powder, and reclaimed rubber Add the powder into the high-speed mixer and mix to obtain the first mixture; wherein, the stirring speed is 45r / min, and the stirring time is 12min; step 5) heating the coal tar to 65°C; step 6) in the first mixture The heated coal tar was added for kneading treatment to obtain the second mixture; wherein, the temperature of the kneading treatment was 85° C., and the kneading treatment ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| softening point | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 

