A kind of pretensioning method prestress tensioning construction method

A construction method and prestressing technology, applied in the processing of building materials, construction, building construction, etc., can solve the problems of poor control of synchronization, difficulty in controlling synchronization, and small loss of prestressing, etc., to improve the quality of tension , small prestress loss, good tensile stress effect

Active Publication Date: 2019-02-01
CHINA RAILWAY 23RD BUREAU GRP RAILTRANSIT ENG CO LTD +1
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to: aim at the complex structure of the traditional tensioning pedestal and the cumbersome process, poor control of synchronization, and loss of prestress in the traditional through-type tensioning method in the tensioning process, and design a A new tensioning pedestal with a simple structure, thereby providing a pre-tensioning prestressed tensioning construction method according to the new tensioning pedestal. The pretensioned prestressed tensioning construction method can simplify the tensioning process and overcome the simultaneous tension at both ends. Tensioning is difficult to control the synchronization problem, and the loss of prestress is small

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of pretensioning method prestress tensioning construction method
  • A kind of pretensioning method prestress tensioning construction method
  • A kind of pretensioning method prestress tensioning construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0046] Such as Figure 3-5 As shown, the pre-tensioning prestressed tensioning construction method includes the following steps:

[0047] a. Making and arranging the components of the tensioning pedestal. Fabricate the tension pedestal, including the base plate 1 and the force transmission column 2 arranged on both sides of the base plate 1, the force transmission column 2 and the base plate 1 are an integrated structure, the base plate 1 and the force transmission column 2 are reinforced concrete structures, and the force transmission column 2 is Strip structure, the fixed steel beam 4 at the tension end and the steel beam 6 at the fixed end arranged at both ends of the force transmission column 2 are welded steel structures. Before tensioning, the fixed steel beam 4 at the tension end and the steel beam at the fixed end 6 is placed on both sides of the force transmission column 2, and is not connected to the force transmission column 2 and the bottom plate 1. The fixed ste...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses the technical field of precast beam construction, and particularly relates to a pre-tensioning-method prestress tensioning construction method. The method comprises the following steps that (1) all components of a tensioning pedestal are manufactured and arranged; (2) one ends of all steel strands are fixed to a fixed end steel cross beam of the tensioning pedestal, and the other ends of all the steel strands are fixed to a tensioning end movable steel cross beam; (3) single-beam-of-steel-strand tensioning equipment is used for preliminarily tensioning all the steel stands in sequence; (4) a centre hole jack located on the outer side of a tensioning end fixed steel cross beam is started and drives a traction steel bar to outwards pull the tensioning end movable steel cross beam, so that the whole steel strands are tensioned; (5) the centre hole jack is stopped, and tensioning stress is kept for a period of time; and (6) concrete pouring, maintenance, demoulding and tension releasing are conducted, and the whole tensioning process is completed. By the adoption of the method, the tensioning procedure is greatly simplified, the problem that synchronism is difficult to control when the two ends are tensioned at the same time is solved, and the process is simple and easy to operate.

Description

technical field [0001] The invention relates to the technical field of prefabricated beam construction, in particular to a pretensioning prestressed tensioning construction method. Background technique [0002] Pretensioning method is a method of pre-stressing concrete members during the prefabrication process to improve the performance of members in order to improve the crack resistance of reinforced concrete members and avoid premature cracks in reinforced concrete members. Usually, the method of tensioning steel bars before pouring concrete is also known as pretensioning, and it plays an important role in engineering construction. [0003] At present, when the pre-tensioning method is used to prepare prefabricated beams, the structure of the tensioning platform used is relatively complicated, such as figure 1 and figure 2 As shown, it includes a bottom plate 1 and a support reaction wall 10, the support reaction wall 10 is arranged at both ends of the bottom plate 1, a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/12
CPCE04G21/121
Inventor 黄静罗晓明秦小三汪正银林茂德方东明崔爱军黄力平孙波孙汉贵蒋汉祥何志勇李良才张召徐闯王俊和孙施健
Owner CHINA RAILWAY 23RD BUREAU GRP RAILTRANSIT ENG CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More