An executive device and integrated machine technology, applied to mechanically driven excavators/dredgers, earth movers/shovels, construction, etc., can solve problems such as large amount of cleaning and dredging, labor occupation, and ditch blockage, etc., to achieve The effect of high bucket sharpness, strong working ability and fast scraping speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
[0020] Such as Figure 1 to Figure 5 As shown, a full-automatic roadbed pavement ditch maintenance all-in-one implementing device includes a three-degree-of-freedom parallel mechanism 4 and a cleaning device 5; the three-degree-of-freedom parallel mechanism 4 is located directly below the cleaning device 5, and the three-degree-of-freedom parallel mechanism The upper end of the mechanism 4 is connected with the cleaning device 5 .
[0021] Such as figure 1 and figure 2 As shown, the three-degree-of-freedom parallel mechanism 4 includes a fixed platform 41, a moving platform 42, an ear seat 43, a rotating shaft 44, an electric push rod 45, a ball hinge 46, a connecting seat 47 and a limit spring 48, and the ear seat 43 , rotating shaft 44, el...