A joist device for installing upper and lower support rods with a c-shaped frame of a large-scale moving arm tower crane
A technology of C-shaped frame and movable arm, which is applied to cranes and other directions, can solve problems such as difficult welding quality, difficult force transmission path, and complicated calculation, and achieve the effects of reducing welding deformation, ensuring welding quality, and clear force transmission
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] In order to understand the technical content of the present invention more clearly, the following examples are given in detail.
[0045] See Figure 1-Figure 20 As shown, the large-scale moving arm tower crane C-shaped frame of the present invention is installed with an upper and lower brace part joist device comprising a horizontal joist 1, a vertical diagonal stay 2, a diagonal stay embedded part 3, a vertical diagonal brace 4 and a diagonal The strut embedded part 5, the horizontal joist 1 is used to support the two beams in one C-shaped frame 10, and the two beams in one C-shaped frame is provided with an embedded part on the side facing the building structure, and the embedded parts are pre-embedded in the building structure, and the diagonal stay embedded parts 3 and the diagonal brace embedded parts 5 are arranged vertically and are used to be embedded in the first building structure and the second building structure respectively. The embedded part 3 of the tie ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


