A New Energy Priority Scheduling Method Based on Two-Stage Unit Combination
A unit combination and priority scheduling technology, applied in the field of power systems, can solve problems such as poor operational flexibility, poor physical effects, and unfavorable new energy priority consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The core of the present invention is to provide a new energy priority scheduling method based on two-stage unit combination, so as to further optimize the new energy priority scheduling and improve the new energy operation level.
[0030] In order to enable those skilled in the art to better understand the solutions of the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0031] Please refer to figure 1 , figure 1 It is a new energy priority scheduling method based on two-s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


