Slope protection method
A slope surface and integrated technology, applied in excavation, coastline protection, construction, etc., can solve the problems of complex structure of slope protection bricks, difficulty in guaranteeing the strength of slope protection structure and construction cost, high technical requirements, etc., and achieve extensive practical promotion value and application prospect. The effect of firm structure, high strength and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Embodiment 1, reference Figure 1-Figure 8 , is a schematic structural view of the protective block in this embodiment. The basic shape of the protective block is a cuboid structure, including a front surface 11, a rear bottom surface 15, an upper side 12, a lower side 13, a left side 14, and a right side 14. The protective block 1 is also provided with a through hole 2 through the upper side 12 and the lower side 13. When the protective blocks are stacked on the slope, the through holes of the adjacent protective blocks in the up and down direction are connected; on the upper side 12 of the protective block 1. At least one pair of protrusions 17 and grooves 16 are oppositely provided on the lower side 13, and the size of the protrusions 17 is smaller than the size of the grooves 16. In order to adapt to changes in the gradient of the slope, as image 3 As shown, preferably the size of the left and right direction of the groove 16 is greater than the size of the front a...
Embodiment 2
[0051] Embodiment 2, the present embodiment proposes a kind of slope protection method according to the protective block described in embodiment 1, below in conjunction with Figure 11-1 to Figure 11-6 Specifically explain the specific slope protection construction process:
[0052] (1) excavate a trench 41 along the bottom of the slope to be protected, the cross-section of the trench 41 is trapezoidal, a cornerstone 31 is arranged in the trench 1, and foundation concrete is poured on the cornerstone 31 formed with gravel or the like 32; the base concrete 32 can be poured on site; for example, concrete can be poured into a mold made of concrete formwork at the construction site and hardened; (2) the upper surface of the base concrete 32 is smoothed with mortar , horizontally lay the first layer of main protection block 1, and backfill the trench 41 (of course, the first layer of main protection block can also use auxiliary protection block 1b, which can be flexibly selected ac...