Demulsification and dehydration method for oilfield produced fluid
A technology for produced fluids and oil fields, applied in chemical dehydration/demulsification, etc., to achieve high demulsification performance, reduced production energy consumption, and low dehydration temperature
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] Embodiment 1 The demulsification and dehydration method of oilfield production fluid comprises the following steps:
[0025] (1) To the oilfield production fluid entering the pipeline (the volume of oilfield production fluid is 5200m 3 ) into the pre-dehydrating agent, and then enter the pre-separation cylinder from the inlet of the three-phase separator. The pressure of the three-phase separator is 0.2MPa, and most of the gas is separated in the pre-separation cylinder. The exhaust hole on the top is discharged; the pre-dehydrating agent is made of polyacrylamide, polyethylene polyamine and diethylene glycol in a mass ratio of 3:2:1;
[0026] (2) Step (1) The pre-degassed oil-water mixture enters the primary settling tank and the secondary settling tank sequentially through the catheter. The settling time of the primary settling tank is 52 minutes, and the settling time of the secondary settling tank is 45 minutes. A dosing station is respectively set up in front of t...
Embodiment 2
[0028] Embodiment 2 The demulsification and dehydration method of oilfield production fluid comprises the following steps:
[0029] (1) To the oilfield production fluid entering the pipeline (the volume of oilfield production fluid is 5200m 3 ) into the pre-dehydrating agent, and then enter the pre-separation cylinder from the inlet of the three-phase separator. The pressure of the three-phase separator is 0.3MPa, and most of the gas is separated in the pre-separation cylinder. The exhaust hole on the top is discharged; the pre-dehydrating agent is made of polyacrylamide, polyethylene polyamine and diethylene glycol in a mass ratio of 3:2:1;
[0030] (2) Step (1) The pre-degassed oil-water mixture enters the primary settling tank and the secondary settling tank sequentially through the catheter. The settling time of the primary settling tank is 66 minutes, and the settling time of the secondary settling tank is 55 minutes. A dosing station is respectively set up in front of t...
Embodiment 3
[0032] Embodiment 3 The demulsification and dehydration method of oilfield production fluid comprises the following steps:
[0033] (1) To the oilfield production fluid entering the pipeline (the volume of oilfield production fluid is 5200m 3 ) into the pre-dehydrating agent, and then enter the pre-separation cylinder from the inlet of the three-phase separator. The exhaust hole on the top is discharged; the pre-dehydrating agent is made of polyacrylamide, polyethylene polyamine and diethylene glycol in a mass ratio of 3:2:1;
[0034] (2) Step (1) The pre-degassed oil-water mixture enters the primary settling tank and the secondary settling tank sequentially through the catheter. The settling time of the primary settling tank is 60 minutes, and the settling time of the secondary settling tank is 50 minutes. A dosing station is respectively set up in front of the primary settling tank and the secondary settling tank, and a demulsifier is added to the oil-water mixture through ...