Complex bending test device of deepwater top tensioned riser
A bending test and top-tensioning technology, which is applied in the direction of applying stable tension/compression to test the strength of materials, and can solve problems such as complex calculations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Complex bending test setup for deep water top tensioned risers such as figure 1 As shown, it includes a fixed frame 16, a model pipeline 1 located on the fixed frame 16, and a water supply pipeline system. The upper and lower sides of the model pipeline 1 are connected to the water supply pipeline system; the upper end of the model pipeline 1 is provided with a first piston 30, The lower end of the model pipeline 1 is provided with a second piston 31, and the fixed frame 16 is connected with a first buckle 10 and a second buckle 12. The tail of the first piston 30 is installed on the first buckle 10, and the tail of the second piston 31 is installed on the second buckle. Buckle 12; Fixed mount 16 lower side is provided with slideway 9, reaction force frame 14, and slideway 9 cooperates and is connected with chute 5, and chute 5 is provided with second support 3, and second support 3 is connected with second card. Disk 2, the lower side of the model pipeline 1 is connect...
Embodiment 2
[0059] Complex bending test setup for deep water top tensioned risers such as figure 1 As shown, it includes a fixed frame 16, a model pipeline 1 located on the fixed frame 16, and a water supply pipeline system. The upper and lower sides of the model pipeline 1 are connected to the water supply pipeline system; the upper end of the model pipeline 1 is provided with a first piston 30, The lower end of the model pipeline 1 is provided with a second piston 31, and the fixed frame 16 is connected with a first buckle 10 and a second buckle 12. The tail of the first piston 30 is installed on the first buckle 10, and the tail of the second piston 31 is installed on the second buckle. Buckle 12; Fixed mount 16 lower side is provided with slideway 9, reaction force frame 14, and slideway 9 cooperates and is connected with chute 5, and chute 5 is provided with second support 3, and second support 3 is connected with second card. Disk 2, the lower side of the model pipeline 1 is connect...
PUM
Login to View More Abstract
Description
Claims
Application Information