Construction method of full-section grouting shield in water-rich rock formation under sensitive buildings

A construction method and building technology, which is applied to earth drilling, underground chambers, shaft equipment, etc., can solve problems such as difficult to meet expected quality requirements and progress goals, shield tunneling cannot be normally excavated, and high water content in soil bins, etc., to achieve Control surface subsidence, reduce groundwater loss, and ensure safety

Active Publication Date: 2019-05-17
YSD RAIL TRANSIT CONSTR CO LTD
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, if in the water-rich rock formation, the bedrock fissure water and the overburden pore water have a certain degree of connectivity, there are many fissure channels and a large amount of water inflow, and the use of deep hole grouting to stop water or drainage excavation will easily cause the soil to contain water. The water volume is too high and the soil pressure is difficult to control, which leads to the spewing of the screw machine, the failure of the shield tunneling, and the loss of groundwater, which affects the safety of the surface buildings (structures), and it is difficult to meet the expected quality requirements and progress goals

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of full-section grouting shield in water-rich rock formation under sensitive buildings

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The present invention will be further described below in combination with specific embodiments and accompanying drawings.

[0028] An intercity rail project in Nanhai District, Foshan City, Guangdong Province. A shield tunnel in the project has a buried depth of 47.5 meters and a water head height of 35 to 39 meters. The tunnel body is made of Tertiary gravel-bearing sandstone with well-developed rock mass joints and fissures , the face of the tunnel has relatively large fissure water, and the bedrock fissure water in the tunnel body has certain connectivity with the pore water of the Quaternary overburden. The surface of this section of the tunnel is a textile city, and some buildings are sensitive to groundwater loss, and some settlement and cracking have occurred before the shield tunnel passed through. In view of the above situation, the construction method of the full-section grouting shield under the water-rich rock layer under the sensitive building according to ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Provided is a construction method of a below-sensitive-building water-enriched rock stratum full-section grouting shield. The construction method of the below-sensitive-building water-enriched rock stratum full-section grouting shield includes the construction steps of reinforcing shield sealing, filling the periphery of the shield with bentonite, supplementing grout to gaps behind duct-piece walls, replacing muck with gas, replacing the gas with grout, grouting full sections, detecting grouting effects and conducting shield tunneling. By the adoption of the construction method of the below-sensitive-building water-enriched rock stratum full-section grouting shield, base-rock gap channels can be effectively sealed in all directions, loss of underground water is reduced, tunneling environment is improved, soil transporting of a screw conveyor is facilitated, so that the shield tunnels rapidly, and descending of buildings on the earth surface can be effectively controlled.

Description

technical field [0001] The invention relates to the field of shield tunnel construction, in particular to a full-section grouting shield construction method of a water-rich rock layer under a sensitive building. Background technique [0002] The shield method has the advantages of high degree of automation, high safety factor and fast construction speed, and is widely used in urban subway tunnel construction. The shield machines commonly used in the shield method mainly include mud-water pressure balance shield machines and earth pressure balance shield machines. The mud-water pressurized balance shield machine pressurizes the mud water to balance the external pressure of the excavation surface, and relies on the mud pump to pump the mud to the ground and separates and purifies it. Therefore, it is suitable for water-bearing sand layers, clay layers and weak strata with high groundwater levels. It is not suitable for unbreakable surrounding rock formations. The earth press...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/087E21D11/10E21D9/12E21D11/38C04B28/00
Inventor 林辉肖秋生李学荣薄利乔国华吉艳雷吴文彪谭荣珊杨欢杨孝嵩王建江
Owner YSD RAIL TRANSIT CONSTR CO LTD