An optimized low-frequency load shedding method for enterprise isolated network operation based on goose network
A technology of low-frequency load shedding and isolated grid, which is applied in the direction of AC network circuit, AC network voltage adjustment, and power network operating system integration, etc. Hierarchical management and other issues to achieve the effect of ensuring safe and stable operation and reducing recovery time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] The technical solutions of the present invention will be further described below through specific examples.
[0010] Such as figure 1 As shown, it is a configuration block diagram of the optimized low-frequency load shedding system based on the GOOSE network of the present invention for enterprise isolated network operation.
[0011] Two sections of 10kV bus run in parallel. Two generators running in parallel on the left side of the bus are respectively connected to the two sections of bus. The right side of the bus is a feeder. Some feeders supply power to nearby equipment, and some feeders extend to distant places to supply power to loads. This is a typical enterprise-owned power plant's isolated grid primary equipment configuration scheme.
[0012] For secondary equipment, configure low-frequency load shedding devices near the power busbar, configure line protection measurement and control devices on the lines, configure equipment protection measurement and control ...