Unlock instant, AI-driven research and patent intelligence for your innovation.

The method of installing the prefabricated cover beam on the column

A prefabricated cover and cover beam technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of low cover beam positioning accuracy, long alignment time, low efficiency, etc., saving time, improving positioning accuracy, The effect of improving work efficiency

Active Publication Date: 2019-06-25
SHANGHAI ROAD & BRIDGE (GRP) CO LTD
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0011] The technical problem to be solved by the present invention is to provide a prefabricated cover beam installed on the column in order to overcome the defects of the prior art that the prefabricated cover beam is installed on the column, the alignment time is long, the efficiency is not high, and the positioning accuracy of the cover beam is low. method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The method of installing the prefabricated cover beam on the column
  • The method of installing the prefabricated cover beam on the column
  • The method of installing the prefabricated cover beam on the column

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0061] The present invention is further illustrated below by means of examples, but the present invention is not limited to the scope of the examples.

[0062]This embodiment provides a method for installing a prefabricated cover beam on a column, Figure 1-3 It is a flow chart of the method for installing the prefabricated cover beam on the column in this embodiment, Figure 4-6 It is a schematic diagram of the state during the implementation of the steps.

[0063] Such as figure 1 , Figure 4 As shown, the method of installing the prefabricated cover beam on the column includes:

[0064] Step 101 , placing the pad 2 on the upper end surface of the column 1 . In this embodiment, a steel bar 12 is fixedly arranged on the upper end surface of the column 1 , and the steel bar 12 extends upward along the height direction of the column 1 . The lower end surface of the prefabricated cover beam 4 is provided with a groove 42 , and the groove 42 is used for fitting the outer edg...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for installing a prefabricated cover beam on a standing column. The method includes the steps that S1, pad tables are put on the upper end face of the standing column;S2, mortar is laid in other areas except for areas in which the pad tables are put on the upper end face of the standing column so that a mortar layer can be arranged on the upper end face of the standing column, and the upper surface of the mortar layer is lower than the upper surfaces of the pad tables; S3, the prefabricated cover beam is put on the upper end faces of the pad tables and adjusted, and reaches the preset position; S4, the prefabricated cover beam is lifted a certain distance in the vertical direction, the upper surfaces of the pad tables are adjusted to the portion lower thanthe upper surface of the mortar layer, and the prefabricated cover beam falls down and is pressed on the upper surface of the mortar layer in the vertical direction till the prefabricated cover beamis put on the upper surfaces of the pad tables. According to the method, position adjustment of the prefabricated cover beam is only carried out one time in the whole process, and compared with the condition that a prefabricated cover beam needs to be adjusted two times to the preset position in a traditional method before adjustment, time is saved, and the position accuracy of the prefabricated cover beam is increased.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a method for installing a prefabricated cover beam on a column. Background technique [0002] In the prefabricated bridge, the columns and prefabricated cover beams are all prefabricated in the factory, and the prefabricated cover beams are hoisted by large lifting equipment on site, and then installed on the columns. On the one hand, the joint surface of the column and the prefabricated cover beam needs to ensure the flatness, so that the prefabricated cover beam can reach the preset position; [0003] Conventional practice generally adopts the following steps to realize the installation and fixation of prefabricated cover beams and columns: [0004] 1. Trial adjustment without sitting on the pulp [0005] Set steel backing plates at the four corners of the top of the column. Each steel backing plate is superimposed by multiple steel plates of different thicknesses...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 贾雷刚魏明明熊太磊史璐琨张政张秋柏
Owner SHANGHAI ROAD & BRIDGE (GRP) CO LTD