Construction method of cantilever-cast girder side-span cable-stayed support
A construction method, a cable-stayed technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of long support period, high foundation requirements, large amount of materials, etc., and achieve good benefits and high recycling rates , High recovery effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0053] Example: Reference figure 1 , a construction method for a side-span cable-stayed support of a cantilevered beam, comprising the following steps:
[0054] S1: construction preparation;
[0055] S2: Embedding of embedded parts of pier body;
[0056] S3: Pier body, inclined column connecting rod welding;
[0057] S4: The slanted columns are erected to form a support system;
[0058] S5: installation of the back lightning beam;
[0059] S6: Flaw detection test, if qualified, go to S7, if unqualified, return to S3;
[0060] S7: preload;
[0061] S8: Construction of the main body of the cast-in-place section;
[0062] S9: The support system is removed.
[0063] S1: Construction preparation includes:
[0064] 1) The support system has passed the design inspection and calculation.
[0065] 2) The bracket material has passed the acceptance check of the site, and the processing of the bracket rods is completed.
[0066] 3) Complete the preparation of work instructions and...