Deep-buried tunnel instant rock burst active control method
A tunnel, prevention and control technology, applied in the field of geotechnical engineering, can solve the problems of neglecting dynamic impact and failing to fundamentally solve the problem of instant rock burst in deep-buried tunnels, so as to reduce the amount of engineering, reduce the amount of charge, and reduce the construction cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, the following will be described in detail with reference to the accompanying drawings and specific embodiments.
[0035] The invention provides a method for active prevention and control of instant rock burst in deep-buried tunnels.
[0036] The general steps of this method are as follows:
[0037] (1) Determine the magnitude and direction of the maximum principal stress and the minimum principal stress of the tunnel face;
[0038] (2) According to the magnitude and direction of the principal stress determined in step (1), determine the position and number of the deep blastholes in the central area in front of the face, and drill into the deep area in the central area in front of the face in the direction parallel to the tunnel excavation axis The blasting hole and the undercutting hole, the hole depth is 2d, where d is the depth of the conventi...