[0030]Starting from the principle of the present invention, the present invention will be described in detail below with reference to the accompanying drawings.
[0031]The mechanics principle of the pier toppling of the present invention is: after cutting and separating the part within a certain height of the upper part of the pier from the bottom part, the upper part of the cutting line 6 is tilted by the unilateral jacking device to tilt until its center of gravity plumb line exceeds the edge of the bottom part reserved Then fell on its own. The steel rod in it acts as the shaft 1 to prevent local concrete from crushing and the whole upper part from skewing uncontrollably.
[0032]Such asfigure 1 As shown in the two completed bridge piers, the right pier has quality defects and needs to be removed. The removal method includes the following steps:
[0033]1) Determine the location of the pier cutting line 6 based on the distance between the two piers and the specific height of the pier. At...