Drying and filling flow production line of injection-leading firecrackers
A production line and assembly line technology, applied in pyrotechnics, offensive equipment, weapon types, etc., can solve problems such as a single conveyor belt, lack of handles for firecracker cakes, and limit equipment development, and achieve the effect of efficient production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Embodiment 1: see attached Figure 1-6 , reflecting a specific structure of the present invention, the described firecracker drying and filling production line includes a conveyor belt 307 for transporting firecracker cakes, a conveyor belt 311, and a sprocket wheel 302 chain 303. On-line drying mechanism and bottom sealing mud filling mechanism 5, gunpowder slurry filling mechanism 4 and sealing agent filling mechanism 6. One line completes the filling of all firecracker inner materials. in,
[0028] Described online drying mechanism sees attached Figure 1-3 , including the conveyor belt 307 for transporting the firecracker cake 301, and also comprising two sprocket wheels 302 and chain 303 mechanisms whose horizontal position is higher than that of the conveyor belt 307. The ends of 307 are overlapped, and the sprocket chain mechanism is located in the cavity of the elongated oven 306, and several hooks 304 are evenly distributed around the chain 303. The opposit...
Embodiment 2
[0033] Embodiment 2: see attached Figure 7 , the firecracker cake 701 on the transmission belt 706 is provided with lug 702 (ie hook pendant), and sprocket wheel 705 chain 704 mechanisms are installed in transmission belt 706 both sides respectively. The difference from Embodiment 1 is that the chain 704 does not need to be provided with a hook, and the hanging ear 702 is directly hooked on the connection recess 703 of the chain 704 . After arriving at the end of chain 704, it slides off and breaks away.
Embodiment 3
[0034] Embodiment 3: see attached Figure 8 , the firecracker cake 801 on the driving belt 807 is provided with lugs 802 (i.e. hooks), and the difference with embodiment 1 is that the timing belt is used to replace the sprocket chain mechanism, and the timing belt 805 and the timing belt are respectively installed on the driving belt 807 both sides. Synchronizing wheel 806. The synchronous belt 805 is provided with internal teeth 804 and external teeth 803 , no hooks are needed, and the hanging ears 802 are directly hooked in the slots between the external teeth 803 of the synchronous belt 805 . Then slide off after the synchronous belt 805 end.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


