Hoisting technology of offshore engineering modules with inclined ties

A technology of inclined tie-bar and hoisting, applied in the direction of hoisting device, hoisting device, etc., can solve the problems of increasing construction risks and consuming manpower, and achieve the effect of shortening hoisting operation time, reducing safety risks, and reducing hoisting costs.

Active Publication Date: 2019-08-30
OFFSHORE OIL ENG QINGDAO +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The disadvantages of the above method are: one, need to weld high and low two temporary hanging points
2. Due to the existence of high hanging points, scaffolders need to build a lot of scaffolding to the high hanging points
3. Due to the existence of high-level lifting points, riveters are required to climb the scaffold to remove buckles at high altitudes; welders are also required to climb the scaffolds to perform high-altitude fire cutting operations and painters to climb the scaffolds to repair and paint the scaffolds at high altitudes, and then remove the scaffolds, which consumes manpower and increases construction risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hoisting technology of offshore engineering modules with inclined ties
  • Hoisting technology of offshore engineering modules with inclined ties
  • Hoisting technology of offshore engineering modules with inclined ties

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0026] Such as Figure 1 to Figure 10 As shown, taking the hoisting of an inclined tie bar of an offshore engineering module as an example, the specific implementation process of the process of hoisting and placing the inclined tie bars of the offshore engineering module in the present invention is described.

[0027] 1. Count the specification weight of all inclined ties of the module in the project under construction, and prefabricate the adjustable-length hoisting strut 1, so that the hoisting strut 1 can be applied to the hoisting operation of all inclined ties in the project, such as Image 6 shown.

[0028] 2. Weld lifting point 2 at the low end of inclined tie bar A, such as figure 1 shown.

[0029] 3. First connect the lower U-shaped connector 1c of the hoisting strut 1 to the lifting point 2 with the lower shackle 3, and at the same time connect the shackle 3 to the lower-end wire rope sling 4, such as Figure 7 As shown; then connect the long hoisting strut 1, the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention provides a process for hoisting and placing in-place inclined ties of marine engineering modules, including: prefabricated adjustable-length hoisting struts; welding low-level lifting points; Configure the connection between the high-position U-shaped connector and the sling; adjust the chain hoist so that the lifting angle of the inclined tie bar is equal to the inclination angle in place; lift the hook, lift the inclined tie bar off the ground, fine-tune the chain block to make the hoisting in place, and weld Fix the inclined ties; lower the hooks, remove the low U-shaped connectors, remove the hoisting struts section by section, remove the slings, move the hooks and remove the buckles, and complete the hoisting operation; avoid setting up scaffolding and high-altitude welding after the inclined ties are hoisted in place High-altitude operations such as buckle removal, high-altitude hot cutting, high-altitude paint repair, and scaffold removal can shorten the hoisting operation time, reduce hoisting costs, and operate safely and reliably.

Description

technical field [0001] The invention relates to a hoisting process, in particular to a hoisting and positioning process of a marine engineering module with inclined ties. Background technique [0002] The offshore engineering module contains a large number of slanted tie structures, which are generally hoisted separately in the later stage due to interference with the slings or the overweight of the suspended deck. The traditional hoisting method is: first step, welding two temporary lifting points at the low end and high end of the inclined ties. In the second step, a steel wire rope sling is respectively connected by a shackle on the two temporary suspension points, and a chain hoist is connected on a steel wire rope sling to adjust the inclination angle of the inclined tie bars. The third step is to use a crane to hoist the inclined tie bars in place. The fourth step is to set up the scaffolding, and the construction personnel climb to the high hanging point through the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B66F19/00
Inventor 郭宁徐善辉杨风艳刘超田旺生张刚窦星慧李强刘全刚张建山王阔周武
Owner OFFSHORE OIL ENG QINGDAO