Pouring device and device for preparing heat-resistance steel casting
A casting and sprue technology, which is applied in the direction of casting molds, casting mold components, manufacturing tools, etc., can solve the problems of reducing the work efficiency of medical staff and failing to satisfy patients in real time, so as to reduce the path of molten iron flow, and achieve good quality of finished products. The effect of loss reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] figure 2 The top view of the pouring device provided for Embodiment 1 of the present invention; image 3 Schematic diagram of the structure of the filter 15 provided in Example 1 of the present invention.
[0031] Such as Figure 2-3 As shown, the pouring device provided by the present invention includes a sprue 11, a riser 12 and a mold 13; the sprue 11 communicates with the riser 12, so that molten iron directly enters the sprue 11 from the sprue 11 Said riser 12, said riser 12 communicates with said mold 13, so that molten iron enters mold 13 castings.
[0032] The sprue 11 is connected with the riser 12, so that the molten iron directly enters the riser 12 from the sprue 11, and the riser 12 is connected with the mold 13, so that the molten iron enters the mold 13 for casting; by connecting the sprue 11 and the riser The mouth 12 is connected, so that the molten iron directly enters the riser 12 from the sprue 11, and through the mold 13 connected with the riser...
Embodiment 2
[0052] Figure 4 A top view of the pouring device provided by Embodiment 2 of the present invention.
[0053] Such as Figure 4 As shown, in this embodiment, the pouring device is different from Embodiment 1 in that the mold 13 includes a first mold 131 and a second mold 132, the first mold 131 is located on the side of the riser 12, and the second mold 132 The mold 132 is located on the other side of the riser 12, so that the molten iron enters the riser 12 and enters the first mold 131 and the second mold 132 respectively.
[0054] The first mold 131 is positioned at the left side of the riser 12, and the second mold 132 is positioned at the right side of the riser 12, so that the molten steel enters into the first mold 131 and the second mold 132 respectively after entering the riser 12; The first mold 131 and the second mold 132 are respectively arranged on both sides, so that the molten steel enters from the sprue 11, and the first mold 131 and the second mold 132 on bo...