A technology for road base and comprehensive pipelines, applied in roads, roads, infrastructure engineering, etc., can solve problems such as massive excavation, easy water accumulation, circuit failure, maintenance construction and maintenance costs, etc., to reduce consumption and solve space problems Conflict, save the effect of civil construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Accompanying drawing is a kind of specific embodiment of the present invention.
[0035] In the construction method of the road base concrete side form integrated comprehensive pipeline of the present invention, when constructing the base concrete side form, the facility pipeline designed within the range of the green belt is incorporated into the concrete side form, and the pouring is completed synchronously;
[0036] Before construction, according to the construction content, the construction team will be staffed. The conventional pipeline positioning workers are 4 people, 4 formwork workers, 3 concrete workers, and 2 general workers. According to the division of labor, management personnel, mechanical operators, and on-site labor personnel are responsible for their respective duties. Conduct three-level technical disclosure and safety disclosure to all participating personnel to ensure that the construction technology is well prepared. The specific steps of construc...