Method for assembling deep tunnel shield whole-ring test segment
A technology of segment assembly and deep tunnel shield, applied in tunnels, tunnel linings, shaft equipment, etc., can solve the problems of difficult rubber strips to be compressed into grooves, unable to maintain the stability of the load direction and the accuracy of load size, etc., to improve quality and The effect of efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0032] A combined multi-ring shield segment assembling method for horizontal arrangement test provided by the present invention comprises the following steps (horizontal test device for 1:1 mechanical simulation test of deep tunnel combined multi-ring shield designed with staggered joints) and segment assembly method as an example):
[0033] 1. Lay (30mm) thick steel plates on the selected floor to increase the bearing and flatness of the floor throughout the test.
[0034] 2. On the laid steel plate, use measuring instruments to mark the installation centerline and sideline of the inner and outer rings of the test frame;
[0035] 3. On the laid steel plate, mark the theoretical center line of the base of the segment test piece with a measuring instrument such as a gathering station, and protrude the structural size of the segment after pasting the wat...