Device and method used for simulating soil deformation process induced by stratum loss
A technology for soil deformation and stratum simulation, which is applied to measuring devices, instruments, surveying and mapping, and navigation, and can solve problems such as inability to simulate soil deformation processes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Embodiment 1: A kind of device for simulating the deformation process of soil mass induced by formation loss, see Figure 1-10 , including a test container 1, a strip-shaped building simulant 3, a construction process simulant 2 and a soil simulant. A soil simulant (not shown) is used to be arranged in the test container 1 to jointly support the elongated building simulant 3 with the test container 1 . The construction process simulant 2 includes a round hard pipe 21 and a leak switch. The round hard pipe 21 is used to be arranged in the soil simulant. In the test preparation stage, the soil simulant needs to fill the test container 1 and the strip-shaped building simulation In the space enclosed by the object 3 and except the space outside the round hard tube 21. The axis of the round hard tube 21 is parallel to the bottom surface of the elongated building simulant 3, and the axis of the round hard tube 21 is perpendicular to the projection of the length direction of ...
Embodiment 2
[0040] Embodiment 2: a method for using a device for simulating the soil deformation process induced by formation loss, see Figure 1-10 , the device for simulating the soil deformation process induced by formation loss includes a test container 1, a strip-shaped building simulant 3, a construction process simulant 2 and a soil simulant. A soil simulant (not shown) is used to be arranged in the test container 1 to jointly support the elongated building simulant 3 with the test container 1 . The construction process simulant 2 includes a round hard pipe 21 and a leak switch. The round hard pipe 21 is used to be arranged in the soil simulant. In the test preparation stage, the soil simulant needs to fill the test container 1 and the strip-shaped building simulation In the space enclosed by the object 3 and except the space outside the round hard tube 21. The axis of the round hard tube 21 is parallel to the bottom surface of the elongated building simulant 3, and the axis of th...
Embodiment 3
[0043] Embodiment 3: A method for using a device for simulating the soil deformation process induced by formation loss. As a further improvement to Embodiment 2, the following features are added in this embodiment:
[0044]The strip hole 211 comprises a left side strip hole, a top strip hole, and a right side strip hole, and the top strip hole is arranged on the top of the round hard tube 21, and on the peripheral surface of the round hard tube 21, the left side strip hole The radians between the center line, the center line of the right strip hole and the center line of the top strip hole are all acute angles. In the step of simulating the construction process, when the leak switch corresponding to the top strip hole is pulled, it is used to simulate directional drilling construction ; Simultaneously pull the leak switch corresponding to the left strip hole and the right strip hole to simulate pipe jacking construction; simultaneously pull the leak switch corresponding to the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


