Unlock instant, AI-driven research and patent intelligence for your innovation.

The connection structure and connection method of steel pipe concrete column and reinforced concrete prefabricated beam

A technology for concrete-filled steel tubular columns and reinforced concrete, which is applied to building structures, buildings, etc., can solve problems such as difficulty in pouring concrete, high welding quality requirements, and weakening of steel tube columns, and achieves simple construction, convenient and accurate installation, and improved energy consumption. effect of ability

Active Publication Date: 2021-02-02
SHANDONG JIANZHU UNIV
View PDF14 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The connection joint composed of steel pipe concrete column and reinforced concrete prefabricated beam is a connection joint widely used in the construction industry, but the traditional connection joint passes the steel bar through the steel pipe column to form a through bar, which is easy to weaken the force of the steel pipe column Effect, it is difficult to pour concrete in the square steel pipe, and the manufacturability is poor
In addition, the joint welding components have a large workload on site, high welding quality requirements, complex processing, and brittle failure.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The connection structure and connection method of steel pipe concrete column and reinforced concrete prefabricated beam
  • The connection structure and connection method of steel pipe concrete column and reinforced concrete prefabricated beam
  • The connection structure and connection method of steel pipe concrete column and reinforced concrete prefabricated beam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, not all of them. Based on the embodiments of the present application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present application.

[0029] figure 1 , image 3 The connection structure between the steel pipe concrete column and the reinforced concrete prefabricated beam is shown. The steel bar inside the reinforced concrete prefabricated beam 2 extends to the outside of the main body of the prefabricated beam. The protruding length is calculated and set according to the cross-sectional size of the prefabricated beam. 5 is drilled with a through hole, and the reinforci...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a connection structure and connection method between a steel pipe concrete column and a reinforced concrete prefabricated beam, comprising a reinforced concrete prefabricated beam, a partition, a steel sleeve, connecting angle steel and a steel pipe concrete column; Outside the main body, the end of the steel bar is connected with the partition, the first surface of the steel sleeve is connected with the steel pipe concrete column, the inside of the steel sleeve is connected with the partition and the steel bar, and the steel sleeve is matched with the partition and the steel bar After the connection, concrete is poured into the inner space of the steel sleeve, and the connecting angle steel is used for connecting the steel tube concrete column and the steel sleeve. The structure adopts the connection method of prefabricated components assembled on site, which maximizes the construction efficiency and facilitates quality control.

Description

technical field [0001] The invention relates to the field of construction engineering, in particular to a connection structure and connection method between a steel pipe concrete column and a reinforced concrete prefabricated beam. Background technique [0002] The beam-column joint is also called the joint core area, which plays the role of transferring load and connecting beam-column in the structure. Most of the structural damage in earthquakes occurs at the beam-column joints, or the collapse of the entire structure is caused by the damage of the beam-column joints. Therefore, the connection properties of the beam-column joints play a decisive role in the stability and overall performance of the entire structure. [0003] The connection joint composed of steel pipe concrete column and reinforced concrete prefabricated beam is a connection joint widely used in the construction industry, but the traditional connection joint passes the steel bar through the steel pipe colu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B1/58
CPCE04B1/185
Inventor 李秀领丁经伟李言鲁西吕相蓉蔡帅孙国华
Owner SHANDONG JIANZHU UNIV